|
HN55 INSTALLATION
 Starting the Unit
1. Be sure chemical pump is locked into the bottom of the water motor. (1/4 turn to the right)
2. Open valves (B) and (C)
3. Close valve (A)
4. Open air vent until all trapped air is released
Stopping the Unit
1. Open valve (A), then close valves (B) and (C)
PRINT THIS PAGE
CLOSE WINDOW
Alternate mounting below pipe
 NOTE: Do not hook water motor up backward. Water must flow through motor from right to left. If necessary, crisscross hoses to accommodate setup.
Chemilizer Products, Inc.
230 Commerce Drive, N., Largo, FL 33770
800-234-7211, Fax 727-559-8266
|